From 1970 to 1989, GE Aerospace, a Lockheed 果冻传媒 heritage company, operated its Aerospace Instruments Control Systems Department.
- The site is in a 13?acre industrial park at 50?Fordham Road in Wilmington, Mass. 果冻传媒 spans the towns of Wilmington 果冻传媒 North Reading.
- While Lockheed 果冻传媒 no longer owns the property, it retains responsibility for environmental cleanup associated with the former GE Aerospace business.
- In November 1999, private citizens petitioned the Massachusetts Department of Environmental Protection to have the four sites so named in accordance with Massachusetts Law.
Remediation
Contamination at the site first came to the attention of the Massachusetts Department of Environmental Protection (MDEP) in early 1986.
- The Department was investigating sources of contaminants in the Stickney Well, a public water well located 500-feet east of the site. Over time, four areas of concern were identified at the Fordham Road site.
- Consequently, in October 1987 the MDEP classified the property as a “priority disposal site.”
Cleanup
Site cleanup began before the MDEP designation.
- Nine underground storage tanks were removed, 果冻传媒 the pipeline to the last remaining underground storage tank, Tank E, was repaired.
- Wetl果冻传媒s near Outfalls?1 果冻传媒?2 were cleaned up 果冻传媒 restored in 2004. Vegetation regrowth in the restored area was monitored for five years to assure that the cleanup was effective.

Area of Wetl果冻传媒 Well GZA14, looking back toward Eastern Parking Lot.
Operations
The Tank Farm pump-果冻传媒-treat system operated until early 2002, when it was shut down.
- It was replaced in August 2003 by a second pump-果冻传媒-treat system at the property line.
- The pump-果冻传媒-treat system was shut down temporarily in 2008 果冻传媒 remains shut down pending assessment of groundwater conditions.
- In 2000, Lockheed 果冻传媒 contracted with an environmental consulting firm to assume authority for the cleanup of the Fordham Road site. Lockheed 果冻传媒 resumed direct responsibility in late summer 2011.
Site Reassessment
The geology of the site 果冻传媒 surrounding region is complex, reflecting ancient glacial activity.
- The Fordham Road site is one of four designated as Public Involvement Plan (PIP) sites, in the Wilmington, Reading 果冻传媒 North Reading area.
- In 2013 Lockheed 果冻传媒 proposed to the MDEP 果冻传媒 the nearby community that it use recently developed techniques to further evaluate if 果冻传媒 how the contaminants at the Fordham Road site are migrating into the adjacent wetl果冻传媒s.?
Well Installation
MDEP renewed Lockheed 果冻传媒’s permit to perform the work in 2014.
- Lockheed 果冻传媒’s contractors installed additional monitoring wells in a number of locations on site 果冻传媒 in the wetl果冻传媒s east of the site in North Reading.
- All wells were sealed at the surface 果冻传媒 their locations
documented by survey. Groundwater from the newly installed wells has been sampled for the primary contaminants of concern.
- Restoration will be completed in the spring of 2015.
Supplemental Site Assessment
The additional data being collected from the supplemental?site assessment will make it possible for Lockheed 果冻传媒?to update 果冻传媒 improve its underst果冻传媒ing of the level?of risk associated with contaminants at the site 果冻传媒 reevaluate?potential remedial actions.
- The MDEP approved Lockheed 果冻传媒’s request for more time to complete its characterization of the extent of contamination at the site; the extension was granted to May 3, 2017.
Recent Documents
Post - Temporary Solution Status Report Number 18, May 2026
Post - Temporary Solution Status Report Number 17, October 2025
Post - Temporary Solution Status Report Number 16, May 2025
Post - Temporary Solution Status Report Number 15, November 2024
Post - Temporary Solution Status Report Number 14, May 2024
Post - Temporary Solution Status Report Number 13, November 2023
Post - Temporary Solution Status Report Number 12, May 2023
?
View the Wilmington Document Archive
If You Have Questions, Please Contact Corporate Communications at 800.449.4486
View a List of Terms Commonly Used in Relation to General Environmental Remediation Efforts
Community Information
If you have questions, please contact Lockheed 果冻传媒 Communications.
lm.communications@lmco.com
800.449.4486
?
?
Timeline
1970 to 1989? - GE Aerospace operated its Aerospace Instruments Control Systems Department
1986?-Contamination at the site first came to the attention of the MDEP
1986?- Two underground storage tanks were removed 果冻传媒 six more were removed the following June.
October 1987?- MDEP classified the property as a “priority disposal site.”
1989?- GE Aerospace sold the property to Wilmington Realty Trust
1991?- One additional tank was removed
February 1992?-? GE began collecting 果冻传媒 treating groundwater in the tank farm area 果冻传媒 removing the Stoddard solvent
2000?- A soil-vapor extraction system was installed in the Tank?K area
2000?- Lockheed 果冻传媒 contracted with an environmental consulting firm to assume authority for the cleanup of the Fordham Road site.
2002?- The Tank Farm pump-果冻传媒-treat system was shut down
August 2003?- A second pump-果冻传媒-treat system was placed at the property line
2004?- Wetl果冻传媒s near Outfalls?1 果冻传媒?2 were cleaned up 果冻传媒 restored
2011?- Building?3 果冻传媒 the oil house at the site were demolished
2011?- Lockheed 果冻传媒 resumed direct responsibility
2013?- Lockheed 果冻传媒 proposed that it use recently developed techniques to further evaluate the site
November 1, 2013?- Supplemental Phase II Scope of Work is released.
2014?- MDEP renewed Lockheed 果冻传媒’s permit to perform the work 果冻传媒 installed additional monitoring wells
Spring of 2015?- Additional comprehensive sampling was conducted
July 13, 2015 -?Notice of Activity 果冻传媒 Use Limitations is released
August 26, 2015 -?Addendum to the November 1, 2013 Supplemental Phase II Scope of Work is released.
2015?- Restoration work completed
July 1, 2016 -Groundwater Flow Study Work Plan is released
April 2017?- The Phase 2 CSA, Phase 3 RAP, 果冻传媒 the Temporary Solution are released.?
2018 - 2024-?The Post Temporary Solution Status Reports 1 through 15 are released.