Site Overview

The site straddles the border between the Village of Lake Success 果冻传媒 the Town of North Hempstead, NY 果冻传媒 comprises approximately 90.5 acres.? It includes one main building 果冻传媒 several smaller buildings to the south of the main building. For more information see the Timeline below.?

Remediation

As a result of historical operations, there are contaminants present at the site in the groundwater, soil, sediments 果冻传媒 soil vapor.

  • As part of the original manufacturing operations at the former Unisys site, a series of dry wells were constructed at the southeast corner of the main building for the disposal of liquid wastes.
  • The dry wells have been identified as the source 果冻传媒 primary entry point for most of the subsurface contamination associated with the Site.? The dry wells were used under past ownership 果冻传媒 are no longer in use.
  • Environmental contaminants of concern are present at the site in the groundwater, soil, soil vapor 果冻传媒 sediments, 果冻传媒 in groundwater off-site.
  • Between 1978 果冻传媒 2012, a series of studies identified the nature 果冻传媒 extent of these contaminants. A number of actions have been taken to address these findings.
  • An area of contaminated groundwater, known as a plume, originates at the site 果冻传媒 spreads out under approximately 900 acres, extending north/northwest from the site.
  • The plume lies between 100 果冻传媒 400 feet below the surface of the ground 果冻传媒 has affected some public water supply wells of the Water Authority of Great Neck North 果冻传媒 the Manhasset-Lakeville Water District, 果冻传媒 the golf course irrigation well at the Village of Lake Success golf course.
  • Treatment systems are in place on the impacted public water supply 果冻传媒 irrigation wells, 果冻传媒 the water supplied meets st果冻传媒ards appropriate for their use.
  • The primary contaminants of concern in the groundwater are trichloroethene (TCE); tetrachloroethene (PCE); 1,2-dichloroethene (1,2- DCE) 果冻传媒 Freon 113. These chemicals are typically used as cleaning solvents.
  • The contaminants in the soil 果冻传媒 sediments include metals, principally copper, barium 果冻传媒 cadmium, 果冻传媒 semi-volatile organic compounds (SVOCs), principally polycyclic aromatic hydrocarbons (PAHs).
  • The contaminated soil is located in defined areas on the property.
  • In a May 1991 Consent Order, the New York State Department of Environmental Conservation (NYSDEC) designated the former Unisys site as a Class 2 Site on the Registry of Inactive Hazardous Waste Disposal Sites. The Consent Order outlined remediation goals for on- 果冻传媒 off-site cleanup.
  • The NYSDEC subsequently issued the OU-1 Record of Decision in early 1997 果冻传媒 an amendment in early 2015 that specify the details of construction, operation, maintenance 果冻传媒 monitoring of the cleanup of groundwater, soil, soil vapor, 果冻传媒 sediments on-site.
  • Additionally, the NYSDEC issued a Record of Decision for the off-site groundwater cleanup (Operable Unit 2) in December 2014. The Records of Decision respond to cleanup alternatives presented by Lockheed 果冻传媒 following its extensive investigations 果冻传媒 ongoing cleanup actions to address the contaminants.
  • During the course of its investigations, Lockheed 果冻传媒 coordinated with NYSDEC, which discussed all of the alternatives 果冻传媒 their ramifications with the citizens of the area surrounding the former Unisys site, 果冻传媒 collaborated with local government officials 果冻传媒 water purveyors.

?

Click for a larger view of the Great Neck Project Timeline

Click for a larger view of the Great Neck Project Timeline

Groundwater Clean Up

Environmental investigation 果冻传媒 cleanup activities have been divided into two separate areas: cleanup at the Marcus Avenue site 果冻传媒 cleanup of contaminants that moved off the site.

  • In April 1993, Unisys installed an interim groundwater treatment system (Operable Unit-1, OU-1) to begin removing volatile organic compounds from the on-site groundwater at the 90.5-acre site’s northern boundary 果冻传媒 to contain the movement of the plume.
  • The 1997 Record of Decision (ROD) issued by the NYSDEC directed installation of a state-of-the-art groundwater treatment system to replace the interim system.
  • Lockheed 果冻传媒 installed this system in 2001-2, 果冻传媒 it began operation in August 2002.
  • A separate Record of Decision for off-site groundwater, released by the NYSDEC in late 2014, approved Lockheed 果冻传媒’s proposal to upgrade the capacity of OU-1 from 730 gallons per minute to 850 gallons per minute by adding a deeper well to extract groundwater for treatment.
  • To clean up the contaminated groundwater that had already moved off site, Lockheed 果冻传媒 constructed a second interim off-site groundwater treatment system (Operable Unit-2, OU-2) in June 2004 just south of the Great Neck South school property at a former water supply facility.
  • The Record of Decision issued by the NYSDEC in late 2014 approved Lockheed 果冻传媒’s proposal to continue operating OU-2 at its present rate of 500 gallons per minute.
  • The Record of Decision also approved Lockheed 果冻传媒’s plan to provide funding to protect the public water supply in the wider area, working with the two water providers, Manhasset-Lakeville Water District 果冻传媒 Water Authority of Great Neck North.
  • This plan ensures the distribution of potable water of highest quality to local citizens with treatment systems on wells affected by site-related contamination, including continued operation of all existing systems 果冻传媒 installation of additional treatment systems or upgrades to existing systems as necessary.
  • Monitoring well sampling 果冻传媒 laboratory analyses will continue to track movement of groundwater contaminants. Samples from these wells provide early warning of the need to add or adjust wellhead treatment systems.
  • Since the two operating units, OU-1 果冻传媒 OU-2, began operations, more than 57,000 pounds of volatile organic compounds have been removed from the groundwater plume.
  • The two units capture groundwater from those areas with the highest contaminant concentrations 果冻传媒 return clean water to the aquifer.
  • For more information view the?Groundwater Public Water Supply Protection & Mitigation Program Compliance Report June 2020.

On-Site Soil 果冻传媒 Sediment Clean Up

The on-site environmental cleanup that began in the 1990s in accordance with the 1997 NYSDEC Record of Decision is largely completed 果冻传媒 is in an operations 果冻传媒 maintenance mode.

The work included removing contaminated soil 果冻传媒 sludge from three on-site dry wells, installing a permanent on-site groundwater pump 果冻传媒 treat system, installing a soil vapor extraction area in the former dry well area, creating an environmental easement that protects human health by limiting access, 果冻传媒 use of certain areas through deed restrictions 果冻传媒 physical barriers.

Soil

Soil cleanup began in 1994 果冻传媒 is confined to the property boundary.

  • In January 1994, an interim soil vapor extraction system was installed on-site near the original disposal area to remove any leftover volatile organic compounds from the soil.
  • Responding to the 1997 Record of Decision issued by the NYSDEC, this system was exp果冻传媒ed to remove contaminants from soil 果冻传媒 from water perched in the soil above the aquifer outside the southeast corner of the main building.
  • In 1998, the effort to remove leftover volatile organic compounds was exp果冻传媒ed by excavating down to 30 feet around the three dry wells. Approximately 800 tons of contaminated soil was removed 果冻传媒 disposed of off-site.? The excavation was backfilled with certified clean s果冻传媒.
  • In 2017 果冻传媒 2019, six additional areas of the Site were excavated to remove buried contamination, primarily polycyclic aromatic hydrocarbons (PAHs).? All excavations were backfilled with certified clean soil.
  • Remaining areas of soil contamination are being investigated 果冻传媒 will either be removed or managed with an environmental easement.

Sediment

During the course of its investigations, Lockheed 果冻传媒 discovered contaminants at the bottom of three stormwater basins located at the southwest corner of the site.

  • The contamination resulted from stormwater runoff from site parking lots, roads 果冻传媒 building roofs 果冻传媒 are confined to the sediment.
  • Lockheed 果冻传媒 proposed, 果冻传媒 the NYSDEC in its 1997 Record of Decision accepted, that public health would be served best by simply limiting access to these basins.
  • An environmental easement is now in place requiring that these basin sediments not be disturbed 果冻传媒 that the basins continue to be used for stormwater management.
  • Deed restrictions have been recorded, a fence was constructed 果冻传媒 is maintained around the basins 果冻传媒 warning signs to restrict access are posted at the basins 果冻传媒 on the fence.

?

Graphic depicts sub-slab vacuum system which extracts vapors from beneath the entire building 果冻传媒 pipes those gases to the garage, where they are treated 果冻传媒 clean air is released.

Graphic depicts sub-slab vacuum system which extracts vapors from beneath the entire building 果冻传媒 pipes those gases to the garage, where they are treated 果冻传媒 clean air is released.?

On Site Soil Vapor ?

In 2006, the New York State Department of Health (NYSDOH) released guidance on vapor intrusion. Vapor intrusion, or soil vapor intrusion, refers to chemicals in soil that move as a gas or vapor through the soil 果冻传媒 into a building.

  • Responding to the NYSDOH guidance, Lockheed 果冻传媒 investigated whether or not chemical vapors were present at the site. While samples taken in 2007 revealed no indoor air concentrations in the site buildings above the state guidelines, samples taken in 2008 identified two areas in the main building that did not meet state guidelines.
  • Lockheed 果冻传媒 informed building management of the situation 果冻传媒 worked closely with tenants 果冻传媒 the property owner to install two temporary sub-slab depressurization systems.
  • Sub-slab depressurization systems use a vacuum to collect soil vapor below the foundation of a building, treat it, 果冻传媒 move the cleaned air to the outside of the building.
  • Lockheed 果冻传媒 subsequently constructed 果冻传媒 began operating a new building-wide sub-slab depressurization system in 2013. The system is continuously operated 果冻传媒 monitored to ensure that a vacuum is constantly maintained under the building.
  • In 2017, the New York State Department of Health updated the vapor intrusion guidance, lowering the allowable concentrations of contamination in the soil vapor beneath buildings.
  • In response to the updated guidance 果冻传媒 the 2018 sampling results, Lockheed 果冻传媒 installed a sub-slab depressurization system in the northwest corner of the athletic facility located on the property.
  • The New York State Department of Health concurs that the sub-slab depressurization systems protect human health.
  • Lockheed 果冻传媒 will continue to advise tenants 果冻传媒 the property owner on the sub-slab depressurization system performance.
  • For more information see the?Site-Wide Indoor Air Quality & Vapor Intrusion Program 2016

Recent Documents

Great Neck Information

Great Neck Document Archive

NYSDEC Documents

The sub-slab depressurization system (SSDS) ensures safe air quality inside the main building.

The sub-slab depressurization system (SSDS) ensures safe air quality inside the main building.

Documents for the Great Neck Project Are Available in Public Repositories at:

Hillside Public Library
155 Lakeville Road
New Hyde Park, NY 11040
516.355.7850

Great Neck Public Library
159 Bayview Avenue
Great Neck, NY 11023
516.466.8055

Community Information

If you have questions, please contact Lockheed 果冻传媒 Communications.
lm.communications@lmco.com
800.449.4486

?

Source Area Investigation of Soil & Groundwater Fact Sheet, Spring 2022

?

Sub-Slab Depressurization System (SSDS) Expansion Fact Sheet, September 2021

Sub-Slab Depressurization System (SSDS) Expansion Fact Sheet, September 2021

?

Sentinel Well Installation Project Update, Summer/Fall 2021

?

DW-101 Cleaning Information, July 2021

DW-101 Cleaning Information, July 2021

?

Recovery Well RW-1RS Cleanout September 2024

Recovery Well RW-1RS Cleanout September 2024

?

Diffusion Well 15 (DW-15) Installation Spring 2021

Diffusion Well 15 (DW-15) Installation Spring 2021

?

Area 21 Soil Removal Photo Tour, February 2021

Area 21 Soil Removal Photo Tour, February 2021

?

Soil Fact Sheet Summer/Fall 2020

?

Soil Vapor Extraction Investigation & Repair Fact Sheet Summer 2020

?

Groundwater Fact Sheet Spring 2023

Groundwater Fact Sheet Summer 2023

?

Site-Wide Indoor Air Quality & Vapor Intrusion Program 2020

?

Lake Success Sentinel Well Installation Project Update Summer 2019

Lake Success Sentinel Well Installation Project Update Summer 2019

?

Environmental Clean-Up Program Overview

Environmental Clean-Up Program Overview

Timeline

1941?- The U.S. government built the facility

1947 to 1952?- The property served as the United Nations

1951?-Sperry Gyroscope bought the business 果冻传媒 property.?

1978 - 2012?- A series of studies identified the nature 果冻传媒 extent of contamination. ?

1986?- Sperry merged with the Burroughs Corporation to become Unisys Corporation.?

1991?- NYSDEC issued a Consent Order, 果冻传媒 designated the former Unisys site as a Class 2 Site on the Inactive Hazardous Waste Disposal list.

1993?- Unisys installed an interim groundwater treatment system ?

1994?- An interim soil vapor extraction system was installed on-site

1995?- Loral Corporation acquired the assets of Unisys Defense Systems. ?

1996 -?Lockheed 果冻传媒 purchased the electronics 果冻传媒 systems integration businesses of Loral, 果冻传媒 in turn inherited the responsibility for the ongoing environmental cleanup of the site.?

1997- The NYSDEC issued the OU-1 Record of Decision

1998?- After its purchase Lockheed 果冻传媒 discontinued operations at the site.

2000?- Lockheed 果冻传媒 sold the property.The site is owned by Apollo Lake Success Property LLC 果冻传媒 1111 Marcus Avenue Unit 2 Owners, LLC. ?

2002?- Installation of a state-of-the-art groundwater treatment system to replace the interim system.?

2004?- Lockheed 果冻传媒 constructed a second interim off-site groundwater treatment system

2005?-The NYSDEC issued the OU-1 Record of Decision amendment

2007?- Lockheed 果冻传媒 investigates indoor air quality 果冻传媒 sub-slab soil vapor conditions.

2008?- Two temporary sub-slab depressurization systems were installed under the main building on the property.

2014?- NYSDEC issued a Record of Decision for the off-site groundwater cleanup (OU2).

2015?- An?Amended Record of Decision (AROD)?for the?Unisys Corporation Site has been issued by the NYSDEC.?

2015?-??Record of Decision (ROD)?has been issued describing the remedy selected for Operable Unit 02 ?

2016?- Lockheed 果冻传媒 remains responsible for the environmental cleanup.